Some assembly required! Trailer for Rick's race car. (A little blurry, it was dark!)
18 Sep 2000 6:09a.m. |



Floor partly done. Betty supervises. Grading and piers done last week.
18 Sep 2000 8:30a.m. |



There are 6 inches of insulation in the floor. The floor is 12x16 feet
18 Sep 2000 10:20a.m. |



Starting to cut the cabin roof off back to the wall. No time for an oops.
18 Sep 2000 11:04a.m. |



South wall up. Air-powered nail gun makes it look easy
18 Sep 2000 2:02p.m. |



North wall going up. It's a beautiful Fall day to work
18 Sep 2000 3:12p.m. |



West wall and first rafter up.
18 Sep 2000 4:19p.m. |



Tricky cutting thru 3" of insulation, and nails. It rains all day.
19 Sep 2000 7:53a.m. |



Framing a skylight. Rick and Mike above, Rob below. (Working late.)
19 Sep 2000 6:58p.m. |



Joining the two rooves. No time for leaks. No rain today.
20 Sep 2000 7:27a.m. |

Shingling the roof. It goes fast with 3 guys and a little sun.
20 Sep 2000 10:36a.m. |



Installing the windows. They're heavy and they all fit.
20 Sep 2000 3:19p.m. |

Cutting thru to cabin. They framed the door from the inside.
20 Sep 2000 4:44p.m. |

Installing ceiling tiles. Mike did the insulation; Rick and Rob do the tiles.
20 Sep 2000 12:28p.m. |



Inside rough cedar trim. Mike cuts, Rob nails. (Rick measures)
21 Sep 2000 3:38p.m. |

The dual skylights. They make the room really bright.
21 Sep 2000 3:38p.m. |

Uncle Conrad sweeps up. A visit from the official family inspector.
21 Sep 2000 4:57p.m. |



Conrad does windows Making the pine look like the cedar of the rest of the room.
22 Sep 2000 3:12p.m. |



The proud crew. Rick, Rob, and Mike.
22 Sep 2000 9:17a.m. |



The final result. Just needs gutters, inside door, and two ceiling fans.
22 Sep 2000 9:19a.m. |